Home › Massachusetts › Westford
Septic Pumping, Inspections and Repair in Westford, MA
Westford has no public sewer, so every home and business runs on a private septic system, and about 40% of properties also draw water from their own well. Call (978) 486-7980 or use the form. A person reads every request and replies with what happens next.
- Free for homeowners
- Town and state septic rules on this page
- Nabnasset to Forge Village
Ask About Septic Service in Your Area
Tell us about the system and what is going on. A person reads it and replies with what happens next.
Please add your name, a 10-digit phone number and a valid email.
Your request didn't go through on our end. Please call (978) 486-7980 so it isn't lost.
Too many requests have come from this connection in a short time. Please call (978) 486-7980 and we'll take it from there.
We couldn't finish the spam check. Wait a moment and send it again, or call (978) 486-7980.
Septic in Westford
What does the system need?

Pumping & Maintenance
Routine tank pumping, filter cleaning and the records your board of health or town may ask for.

Septic Inspections
Title 5 inspections before a Massachusetts sale, and system evaluations for New Hampshire buyers and owners.

Repair & Leach Field Replacement
Broken baffles, failed pumps, backups and leach fields that no longer take water, permitted the way your town requires.

New System Design & Installation
A licensed designer or engineer draws the plan, the town or state approves it, and a permitted installer builds it.
Selling or adding on?
(978) 486-7980Tell us what's planned for the house and what the system is doing, and we'll help you sort out what the Board of Health will ask for.
Permits
Septic permits and rules in Westford
Board of Health. The Westford Board of Health at 55 Main Street handles septic. Its Septic Systems & Title 5 page posts the town's septic regulations, a guide to building permits and septic requirements, the repair and new construction process, lists of licensed septic installers, licensed pumpers and haulers and licensed sanitarians and designers, and the bedroom-count deed restriction form (Septic Systems & Title 5). The same page says a Title 5 inspection report must include a well test.
When a system fails. The Board's guidance says a repair starts with an application for lot testing and its filing fee. A trench permit has to be pulled through the Building Department before the test date, and digging without one may bring a triple fee. The guidance also says not to use a garbage disposal unless the system was designed for one, and not to send water filtration backwash into the septic system (When Your Septic System Fails).
- Public sewer
- None; every home is on a private system
- Board of Health
- 55 Main Street
- Title 5 report
- Must include a well test
- Repair first step
- Lot testing application, plus a trench permit before the test date
- Well to septic
- Drinking wells at least 100 feet from tanks and leach fields
- Wetland buffer
- No septic components in the buffer zone, except as the bylaw allows (rules effective December 9, 2020)
- Additions and basements
- Board policy effective July 1, 2008
Additions and finished basements. The Board's policy effective July 1, 2008 defines a bedroom as a room of at least 70 square feet with a ceiling of 7 feet 3 inches in new space (7 feet in existing space), electrical service, ventilation and at least one window. A home with more than eight rooms is presumed to have half that many bedrooms, rounded down. Adding a bedroom takes existing capacity without variances, a new compliant system or giving up a bedroom elsewhere, and new living space that exceeds 50% of the existing finished space needs a Title 5 inspection from the last two years before initial permit sign-off (Building Permits and Your Septic System).
State rules. A sale needs a Title 5 inspection within two years before closing, or three years if the system was pumped every year and the records go with the report, by a MassDEP-approved System Inspector (MassDEP buying or selling guide); NEIWPCC keeps the list. Designs come from a Registered Sanitarian or a Massachusetts-registered professional engineer, and nothing may flow into a new or repaired system before the Certificate of Compliance issues (310 CMR 15.000). MassDEP says to pump at least once every three years, and every year if the house has a garbage disposal (caring for your septic system).
Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by May 2027. New England Septic Pros is a referral service. We don't pump, inspect or build systems; the contractor files the permits.
Sewer or septic
Sewer or septic in Westford
All septic. Westford's 2010–2015 Open Space and Recreation Plan says plainly that the town does not have public sewer service, and that all homes and businesses rely on private on-site wastewater systems that must meet Title 5 and Board of Health rules (2010–2015 Open Space and Recreation Plan). There is no sewer extension to wait for, no connection rule and no sewer betterment.
What that means at a sale. Because there is no sewer to fall back on, every Westford house that changes hands outside the state's exemptions goes through a Title 5 inspection, and in Westford that report comes with a well test. A failed system gets repaired or replaced on the lot, so soil testing comes first.
Water
Water Westford protects
Wells and wastewater on the same lots. Roughly 40% of Westford properties get drinking water from an on-site well, and bedrock well testing at a sale covers arsenic, coliform, radon and lead among other items(Private Wells). Westford's Well Regulation, in effect since January 14, 2019, keeps wells at least 100 feet from all septic tanks and leaching fields (Well Regulation). The 2010–2015 open space plan says the Water Department's two treatment plants and eight supply wells, five at Forge Village and three at Nutting Road, served about 75% of the population (2010–2015 Open Space and Recreation Plan).
The Stony Brook aquifer. The Water Resource Protection Overlay District has three sub-areas that mirror MassDEP's Zones I to III, and Zone I is a 400-foot radius around drinking water supplies. The Stony Brook corridor sits over the town's only high-yield aquifer, which supplies the public water system (2010–2015 Open Space and Recreation Plan).
Ground that resists. The same plan says till transmits water slowly, which makes it poorly suited for sewage disposal; Paxton soils are limited by slow permeability and stoniness; and Freetown muck has a water table at or near the surface most of the year. Rock outcrops and shallow-to-bedrock soils turn up across town, so soil testing results vary from lot to lot.
Ponds and wetlands. Westford has eight Great Ponds, including Burge's, Flushing, Forge, Grassy, Heart, Keyes, Long-Sought-For and Nabnasset; Forge Pond covers 203 acres. The Wetland Protection Bylaw reviews work within 100 feet of a resource area and 200 feet of a perennial stream (Wetlands and Permitting), and the Wetland Rules and Regulations, effective December 9, 2020, bar any septic system or component in wetlands or the buffer zone except as the bylaw allows (Wetland Rules and Regulations, § 235-2).
Westford's homes
A town of single-family houses on their own systems
Westford had 9,237 housing units in the 2020 Census, and detached single-family homes make up 81.5% of them. As of 2021, more than half of the town's homes had been bought in the previous 11 years (Housing Production Plan 2022–2027). With no sewer in town, a sale here is a Title 5 sale.


Around Nabnasset Lake, the open space plan describes a neighborhood of original summer cottages. Whether you're buying there or in a newer subdivision, ask for the Title 5 report with its well test, the pumping records and any recorded bedroom deed restriction, and check the bedroom count before planning a finished basement.
FAQ
Westford septic questions
Does Westford have town sewer?
No. The town's Open Space and Recreation Plan says Westford does not have public sewer service, so homes and businesses use private on-site systems that must meet Title 5 and Board of Health rules. That also means no sewer connection or betterment to plan around.
Does finishing my basement affect my septic system?
It can. Under the Board of Health's policy effective July 1, 2008, a room of at least 70 square feet with the required ceiling height, electrical service, ventilation and a window counts as a bedroom. If new living space is more than 50% of the existing finished space, a Title 5 inspection from the last two years must go to the Board before permit sign-off, and a bedroom-qualifying room that won't be used as one needs a recorded deed restriction.
Why does a Westford Title 5 report need a well test?
The Board of Health requires it: its septic page says a Title 5 inspection report must include a well test. About 40% of Westford properties rely on an on-site drinking water well, and the town's well rules keep drinking wells at least 100 feet from septic tanks and leach fields.
Can a leach field go near a wetland in Westford?
Generally not. The Wetland Rules and Regulations, effective December 9, 2020, bar installing any septic system or component in wetlands or within the buffer zone except as the wetland bylaw allows. Staff may approve perc tests in the buffer as long as resource areas aren't crossed to reach the site.
What does it cost me to use New England Septic Pros?
Nothing. Asking is free for homeowners; the contractor prices the job, and the price and contract are between you and them.
Nearby