New England Septic Pros home

Home › Massachusetts › Billerica

Septic Pumping, Inspections and Repair in Billerica, MA

About 15% of Billerica sits outside the sewer, and the Board of Health holds those systems to Chapter 5, amended June 2, 2025, with bigger tanks, a winter construction ban and its own licensing for installers and inspectors. Call (978) 486-7980 or use the form. A person reads every request and replies with what happens next.

  • Free for homeowners
  • Town and state septic rules on this page
  • Pinehurst to West Billerica

Ask About Septic Service in Your Area

Tell us about the system and what is going on. A person reads it and replies with what happens next.

Your details go to New England Septic Pros only, so we can reply. We would share them with a contractor only if one becomes available for your area and you agree. Privacy

How your request is handled: it comes to New England Septic Pros. We review it and reply by the next business day. No participating septic contractor covers this area yet, so we can't promise a contractor introduction. If sewage is backing up into the house, stop using water and keep people and pets away from it. If anyone falls into or is overcome at an open septic tank, call 911 and do not climb in after them; tank gases can kill.

Permits

Septic permits and rules in Billerica

Board of Health, Chapter 5. The Billerica Board of Health, through its Director of Public Health, governs septic under Rules and Regulations Chapter 5. Amendments to Sections 1, 2 and 5 were adopted June 2, 2025 after a public hearing the same day (Chapter 5). Perc tests are done in the presence of a Board representative at any time of year when weather allows, deep holes are witnessed by an authorized Board representative, and where an upgrade site has several perc results the slowest rate is used. We found no posted septic permit fees.

Licensed locally. A Disposal Works Installer's License is needed before any construction, upgrade or expansion, and Title 5 System Inspectors need a Billerica license as well as MassDEP approval. Both must pass a local written or oral test on Title 5 and town rules with a score of 80%, offered in March and November by appointment, and renew each January 1. The town posts a Title 5 System Inspector application. Septage haulers must be licensed and file monthly pumping reports with the Board, and Title 5 reports are due within 30 days of the inspection.

Septic tanks
200% of design flow, 1,500 gallons minimum, two compartments, outlet filter
Garbage grinder
1,500-gallon tank and leach area at 150% of design flow
Construction season
No disposal works construction December 1 through March 15
Floodplain
Leaching facility at least 100 feet from the floodplain boundary
Groundwater
Basement floor or slab at least 2 feet above seasonal high groundwater
Design flow
440 gpd per dwelling unit; 330 gpd only with a recorded three-bedroom deed restriction
Additions
Bedrooms or other living space can require an upgrade

More of Chapter 5. No disposal works construction is permitted from December 1 through March 15 of the following year unless the Director finds a threat to health, safety or the environment (§ 5.3.014). It's a standing seasonal rule, so replacement work in that window waits unless the Director makes that finding. Reserve areas must be prepared for system replacement during initial construction. Adding a bedroom, living room, den, family room or other living or substantial storage space requires an upgrade as the Director determines; additions up to 200 square feet, vehicle-only garages, porches, decks and screen houses are exempt (§ 5.2.012). Upgrades that stay out of the floodplain may not need a variance from the 100-foot setback.

State rules. A sale needs a Title 5 inspection within two years before closing, or three years with annual pumping records (MassDEP buying or selling guide). Local boards may adopt rules stricter than Title 5 after a public hearing (M.G.L. c.111 § 31), which is what Chapter 5 is.

Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by May 2027. New England Septic Pros is a referral service. We don't pump, inspect or build systems; the contractor files the permits.

Sewer or septic

Sewer or septic in Billerica

85% sewered. A 1982 wastewater facilities plan found twenty areas that needed an alternative to individual septic systems, which led to 96 miles of sewer by 1988; sewer now serves about 85% of the town (2024 Open Space and Recreation Plan). The Sewer Expansion Program's map, revised September 2021, numbers Needs Areas 4 through 26 but doesn't list which streets each one covers (Proposed Sewer and Needs Areas map).

Contract 37. Needs Area 4, the Webb Brook and Allen Road neighborhoods, is the subject of Sewer Contract 37: about 27,500 feet of sewer with a Shawsheen River crossing on Allen, Battcock, Ravine, Dell Hollow, Sylvan, Riverdale, Intervale, Marshbrook, Arcadia and Garden Brook Roads, Rural Avenue, Whittemore Terrace, Devonshire and Scroxton Drives, Webster Lane, Wentworth Drive and Winsor Road. As of November 2026 it is in design, with survey and borings complete, and no dates are posted (Sewer Contract 37). Contract 38 covers Needs Area 6 and is shown only as a map (Sewer Contract 38). Owners on those streets with a failing system should ask the Board of Health and DPW how the timing affects a repair.

Connecting. We found no rule requiring connection when sewer arrives and no posted betterment. For residential new construction, including tear-downs, the town lists a $150 sewer connection permit plus DPW fees of $1.97 per square foot, with applications online since January 1, 2024 (Wastewater Permits & Fees). The owner maintains the building sewer from inside the foundation wall to the main (Wastewater FAQ).

Water

Water Billerica protects

A river supply and borrowed wellheads. Billerica draws its drinking water from the Concord River and is the only town along the river that does. Zone II wellhead protection areas for neighboring towns' supplies extend into Billerica, and its only high-yield aquifer is a small section on the Shawsheen River near the Bedford line (2024 Open Space and Recreation Plan).

Soils that fight septic. The same plan rates about 55% of the town unsuitable for development that relies on on-site sewage disposal and says seasonally high water tables make siting septic systems difficult. Essex-Scituate soils, with a water table within two feet of the surface and hardpan at 1.5 to 2 feet, are called unsuitable for on-site systems, while Windsor-Hinckley soils absorb effluent quickly but can become sites of groundwater pollution.

Pinehurst

The plan says water tables are usually more than ten feet down in Billerica, except in the Pinehurst area.

West Billerica

Hollis soils, with bedrock one to three feet below the surface, occur mainly here.

Nutting Lake

Septic seepage from older cottages caused a serious water quality problem by the early 1970s. Sewer was extended to the houses, the lake was deepened and water quality has generally improved.

Floodplain and wetlands. Billerica has 51 repetitive-loss flood structures, the most of any non-coastal Massachusetts community, and Chapter 5 keeps leaching facilities 100 feet from the floodplain boundary. The Wetlands Protection By-Law sets a 100-foot buffer and a 200-foot riverfront area (Wetlands Protection By-Law). Under the wetland regulations approved June 25, 2008, an applicant stakes the septic tank and leaching field locations before the site visit, septic work separate from a building is a Category 1 filing at $40 per activity, and an undisturbed strip of 25 feet (lots developed by June 27, 2003) or 50 feet (undeveloped lots) applies (Wetland Protection Regulations).

Billerica's homes

Small lots by the lakes and rivers

The 2018 Master Plan describes older, denser neighborhoods on lots of half an acre or less in East Billerica, Pinehurst, Nutting Lake, Rio Vista, River Pines and North Billerica (2018 Master Plan). Many former seasonal cottages have been converted for year-round use and connected to the town sewer, the open space plan says.

White two-story colonial with blue shutters, a covered front porch and a brick chimney
Low ranch house behind a vine-covered pergola, dense garden beds and a mown front lawn

On a small lot that is still on septic, Chapter 5's 1,500-gallon tank, reserve area and floodplain setback can shape what a replacement looks like. Buyers should ask for the Title 5 report, check whether the inspector holds a Billerica license, and ask whether the street is in a sewer Needs Area.

FAQ

Billerica septic questions

What size septic tank does Billerica require?

Chapter 5 requires tanks sized at 200% of design flow, at least 1,500 gallons with two compartments and an effluent filter at the outlet. A system serving a garbage grinder needs at least a 1,500-gallon tank and a soil absorption system sized at 150% of design flow; a grinder on a system not designed for one is a violation.

Can a septic system be replaced in winter?

Not usually. Chapter 5 does not permit disposal works construction from December 1 through March 15 of the following year unless the Director of Public Health finds a threat to health, safety or the environment. That is a standing seasonal rule each year.

Is sewer coming to my street?

Sewer Contract 37, Needs Area 4, covers about 27,500 feet of sewer in the Webb Brook and Allen Road neighborhoods, including Allen, Battcock, Ravine, Dell Hollow, Sylvan, Riverdale, Intervale, Marshbrook, Arcadia and Garden Brook Roads. It is in design, with survey and borings complete, and the town's page gives no construction dates. Other Needs Areas are numbered on a 2021 map that doesn't list which streets each one covers.

Does my Title 5 inspector need a Billerica license?

Yes. Chapter 5 requires Title 5 System Inspectors to hold a Billerica Board of Health license on top of MassDEP approval, and installers need a Disposal Works Installer's License. Both pass a local test on Title 5 and town rules and renew each January 1.

What does it cost me to use New England Septic Pros?

Nothing. Asking is free for homeowners; the contractor prices the job, and the price and contract are between you and them.

On septic in Billerica? Describe the job.

Call (978) 486-7980
Call NowSend a Request