Home › Massachusetts › Tewksbury
Septic Pumping, Inspections and Repair in Tewksbury, MA
Tewksbury went from 11 sewer pumping stations in 2004 to 46 by 2009, and almost every house can now reach the sewer. For the septic systems still in service, the town's sewer rules decide what happens when one fails. Call (978) 486-7980 or use the form. A person reads every request and replies with what happens next.
- Free for homeowners
- Town and state septic rules on this page
- Repair, connect or decommission
Ask About Septic Service in Your Area
Tell us about the system and whether sewer is on your street. A person reads it and replies with what happens next.
Please add your name, a 10-digit phone number and a valid email.
Your request didn't go through on our end. Please call (978) 486-7980 so it isn't lost.
Too many requests have come from this connection in a short time. Please call (978) 486-7980 and we'll take it from there.
We couldn't finish the spam check. Wait a moment and send it again, or call (978) 486-7980.
Septic in Tewksbury
What does the system need?

Pumping & Maintenance
Routine tank pumping, filter cleaning and the records your board of health or town may ask for.

Septic Inspections
Title 5 inspections before a Massachusetts sale, and system evaluations for New Hampshire buyers and owners.

Repair & Leach Field Replacement
Broken baffles, failed pumps, backups and leach fields that no longer take water, permitted the way your town requires.

New System Design & Installation
A licensed designer or engineer draws the plan, the town or state approves it, and a permitted installer builds it.
Repair or connect?
(978) 486-7980Tell us what the system is doing and whether the sewer runs past the house, and we'll help you sort out which way Tewksbury's rules point.
Permits
Septic permits and rules in Tewksbury
Board of Health. Septic permits come from the Tewksbury Board of Health and are filed online through ViewPoint Cloud (Forms & Permits). Its fee schedule, effective October 20, 2022, charges $250 for a disposal system construction permit for new or revised plans, installation included, and $100 for a single component such as a distribution box or tee. Installers and septage haulers need their own permits (Health fee schedule). The schedule lists no separate soil testing or Title 5 report fee.
- Disposal system construction permit
- $250, installation included (effective October 20, 2022)
- Single component
- $100; additional field inspection $100
- Installer and hauler permits
- $100 installer; $100 per truck for haulers
- Failed system near sewer
- Must connect (Sewer Regulations § 2.08)
- Sewer connection permit
- $150 town fee; town-licensed drain layer
- Sale before sewer arrives
- Title 5 waiver possible with a recorded agreement to connect
Local rules. We found no Board of Health septic regulation beyond Title 5. The town's Sewer Regulations, effective March 1, 2013, do reach private systems: owners must keep them in proper operating condition or the Superintendent may do the work at the owner's cost (§ 2.12), and all tanks, septic tanks and pump chambers included, must be watertight by manufacturer specification or a specified sealing method (§ 2.21) (Sewer Regulations).
Selling before the sewer arrives. Title 5 normally requires an inspection within two years before a sale. In Tewksbury, the Board of Health may waive it only when sewer construction is expected to be finished within two years of closing and an enforceable agreement to connect is signed by the town, seller and buyer and recorded at the Registry of Deeds. The buyer connects within 30 days of the sewer being available and must prevent backups or overflows until then. Adding bedrooms rules the waiver out, though a bathroom inside the existing footprint is allowed, and the town warns that some lenders may not accept it (Decommissioning Septic System).
State rules. Without a waiver, the inspection is done by a MassDEP-approved System Inspector and is good for three years if the system was pumped every year with records (MassDEP buying or selling guide); NEIWPCC keeps the list. Title 5 bars building a new system, or upgrading or expanding one, where a sewer connection is feasible, with listed exceptions (310 CMR 15.004).
Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by May 2027. New England Septic Pros is a referral service. We don't pump, inspect or connect anything; the contractor files the permits.
Sewer or septic
Sewer or septic in Tewksbury
Sewered in five years. The 2016 Master Plan says almost every house and commercial building in Tewksbury has access to the town sewer: about 166 miles of pipe and 46 pumping stations, with treatment at the Greater Lowell wastewater utility (2016 Master Plan). The Water and Sewer Division says most of the build-out was complete by November 2009, apart from road paving, after the town added 35 pumping stations to the 11 it had in 2004 (Water & Sewer Division). The Master Plan also notes that parts of south and east Tewksbury have had substantial flooding and septic system failures. Most homes are now on sewer; we found no official count of the septic systems left.
Failed means connect. Section 2.08 of the Sewer Regulations lets the Board of Health order owners abutting an available sewer to connect under Title 5, and says persons with failed cesspools or septic systems shall be required to connect. No deadline is stated, and fines for failing to connect fall under M.G.L. c.83 § 10. Septage may not be discharged into the sewer (§ 2.09).
Connecting and decommissioning. Every house that ties in must decommission its septic system, and the form comes with the sewer connection application (Decommissioning Septic System). The DPW's connection procedure lists a $150 town permit fee, the work is done by a town-licensed drain layer whose price the town doesn't set, and the DPW needs 24 hours' notice for inspections (Sewer Connection Procedure; Sewer Connections). We found no sewer betterment information.
Water
Water Tewksbury protects
Aquifers under sandy ground. The Merrimack River supplies all of Tewksbury's public water, and 98% of the town is on it; Tewksbury State Hospital uses its own wells. There are four major groundwater aquifers, and an overlay district protects aquifer land. Glacial retreat left mostly sandy, gravelly soil and kettle-hole ponds (2016 Master Plan).
Ponds and wetlands. Long Pond and Round Pond are Great Ponds, and the private 81-acre Ames Pond is the largest; the Master Plan cites septic failures and nutrient loading from development close to wetlands, and wetlands cover more than 20% of the town. The Wetland Protection Regulations bar any activity within 25 feet of a resource area but exempt septic perc tests in the buffer zone or riverfront area when no resource area is crossed to reach the site (Wetland Protection Regulations). The 2024 Wetland Bylaw update, which the town lists as current but posts without an adoption date, adds a 50-foot no-build zone and a 100-foot buffer, 200 feet from vernal pools (Wetland Bylaw).
Tewksbury's homes
Postwar houses, newer sewer
Much of Tewksbury's housing was built between 1950 and 1970, the town's peak growth era, according to the 2003 Master Plan (2003 Master Plan, Chapter 5), and more than 900 houses, about 9% of the stock, date from before 1939 (Master Plan Amendment 2). The big sewer build-out came decades later, mostly between 2004 and 2009.


If you're buying in Tewksbury, ask whether the house is connected and whether the old system was formally decommissioned. If it is still on septic, ask for the Title 5 report and pumping records, and ask the DPW whether the sewer runs past the lot.
FAQ
Tewksbury septic questions
Can I sell without a Title 5 inspection if sewer is coming?
Possibly. The Board of Health allows a waiver only if sewer construction is expected to be complete within two years of closing and the town, seller and buyer sign a recorded agreement to connect. The buyer must connect within 30 days of the sewer being available and prevent backups in the meantime. A buyer who plans to add bedrooms or otherwise increase use isn't eligible, and the town notes some lenders may not allow it.
My septic failed and there is sewer on my street. Can I repair it?
Expect to connect. Under the Sewer Regulations effective March 1, 2013, persons with failed cesspools or septic systems shall be required to connect to the public sewer, and the Board of Health may order owners next to an available sewer to connect under Title 5. Fines for failing to connect fall under state law.
What happens to the old tank when I connect?
It has to be decommissioned. The town's decommissioning form comes with the sewer connection application, and the work goes through a town-licensed drain layer with a $150 town sewer permit fee. Septage can't be dumped into the sewer.
Can a perc test be done near a wetland?
Under the Wetland Protection Regulations, a perc test for a septic system in the buffer zone or riverfront area is exempt as long as no wetland resource area is crossed to reach the site. Other work is barred within 25 feet of a resource area.
What does it cost me to use New England Septic Pros?
Nothing. Asking is free for homeowners; the contractor prices the job, and the price and contract are between you and them.
Nearby